Search
Price Range

House Building Tenerife 2025: Costs, Steps & Tips

house building Tenerife 2025 construction site with ocean view

Building a home on Tenerife in 2025 can be both exciting and complex. In this blog post, we explore house building Tenerife 2025 in depth, from land costs and construction prices to permits and common challenges. Whether you’re planning a coastal luxury villa or a traditional north‑side retreat, this guide will help you navigate every step with confidence.


Land Prices & Site Selection on Tenerife

North vs. South Price Differences

  • Northern areas like La Laguna offer more affordable land with traditional charm.

  • Southern hotspots such as Costa Adeje and Playa de las Américas are pricey, land can reach €4,400+/m², compared to €3,260/m² in Santa Cruz province, and €2,289/m² in less touristy southern towns like Arico. These figures illustrate variation in site values and development potential.

Urban vs. Rustic Zoning

  • Urban sites are ready for construction.

  • “Urbanizable” plots need infrastructure upgrades.

  • Rustic land may face severe restrictions.

    Essential tip: Always verify zoning at the local Ayuntamiento to avoid surprises, many foreign buyers pick a cheap plot only to find they’re not allowed to build.


Construction Cost per Square Metre

Typical Price Range in 2025

In Spain and Tenerife, the average cost to build a family home in 2025 ranges from €1,800 to €2,500/m² (including design, permits, and basic finishes).

  • Luxury features can push prices higher.

  • Economical builds (around €700–1,200/m²) are possible with simpler materials and standards.

Economies of Scale

  • 100 m² homes average around €1,900/m².

  • 150 m² homes might drop to €1,580/m², thanks to spreading fixed costs and contractor discounts.


What Makes Up the Total Cost?

Design & Expert Fees

  • Architect fees typically are 8-15% of construction cost (~10%).

  • Technical supervisor’s fee is ~30% of architect’s fee (2–4%).

    These professionals are mandatory by law and can save you money by avoiding costly mistakes.

Contractor Charges

  • Contractors add ~19% on top of material costs (13% overhead + 6% profit).

  • Example: For €100,000 materials, expect a final cost around €119,000.

Permits & Local Fees

  • Fees include planning, ICIO tax (~3‑5%), debris deposits (~1%).

  • In total, expect ~5–7% of construction cost for permits and municipal fees.

Post-Construction Taxes & Registration

  • Final occupancy license costs ~0.5–1%.

  • Notary and land registry ~0.5%.

  • Document tax (AJD) ~1.5%.

  • Utilities connection: €500–800.

Interior Fit-out & Furnishing

  • Allow 10% of the budget for furniture, appliances, lighting, etc.

  • Hiring an interior designer can cost €50-100/hr but enhances finish quality.


Permits & Regulations

New 2025 Permit Law

Spain’s Decreto‑Ley 3/2025, effective April 2025, speeds up approvals, authorities can now process permits within 6 months, instead of 1–2 years.

Compliance with Building Codes

  • National and local rules (CTE, Plan General de Ordenación) regulate insulation, height, permitted materials, even roof color.

  • Protected zones (coastline, parks) face stricter rules; coastal builds must observe the Ley de Costas (100 m buffer).


Local Factors Affecting Costs

Climate & Microclimates

  • South: hot & sunny, emphasize shading and cooling.

  • North: cooler, humid, focus on waterproofing and drainage.

    Despite mild weather, modern homes still require insulation and ventilation.

Site Geology & Topography

  • Volcanic terrain requires geotechnical studies.

  • Sloped lots (common on Tenerife) may need retaining walls or deep foundations, add extra euros, but offer great views.

Imported Materials & Transport

  • Materials like cement, steel, or specialized items must be shipped to the island.

  • Plan for ~5‑10% higher costs than on mainland Spain. Pre‑order critical materials to lock in prices.

Labour & Contractor Demand

  • Strong demand enables contractors to choose projects and charge more.

  • Reports indicate up to 50% price increases lately.

    Tip: Lock prices early and include escalation clauses in contracts.

Lifestyle Add-ons

  • Extras like pools, guest apartments, or vacation rentals add to costs, but may generate income.

  • Southern tourist zones have strict vacation rental rules, check before investing.


Common Pitfalls & Mistakes

  1. Skipping permits: Illegal work can lead to demolition or fines.

  2. Underbudgeting: Always add a 10-20% contingency to costs.

  3. Buying unsuitable plots: Confirm zoning, utilities, access, and potential coastline restrictions.

  4. Compromising quality: Cheaper materials often fail, causing costly repairs later.

  5. Ignoring timelines: With permits and construction, expect 18-36 months from acquisition to move‑in.


📣 

Thinking of building in Tenerife? Get personalized cost estimates, expert contractor referrals, and permit help, contact us today to turn your island dream into reality.

👉 Want real inspiration? Check out our own Tenerife villa project here from bare land to breathtaking home!

✅ Wrapping Up

Building your dream home through house building Tenerife 2025 requires thorough planning, realistic budgeting, professional support, and patience. Expect costs between €1,500–2,500/m², plus land, permits, taxes, furnishings, and a healthy contingency. Don’t skip legal checks or cheapen materials, your long‑term comfort and investment depend on it.


💡 Additional Resources

  • Related: Tenerife real estate market trends 2025

  • Related: How to choose a contractor in Spain

  • For official details on the 2025 permit reform, consult the Gobierno de Canarias website.

  • Also see external guidance from the Spanish Ministry of Housing for technical building standards.


Join The Discussion